Skip to content

Based near Amsterdam

Spetterloosplasterers & painters

Urgent plasterer or painter, including ceiling repair after a leak

Does a home need to be handed over, sold or let in a few days, or does a ceiling or wall need repairing after a leak? Send in your urgent job and within 24 hours you hear what is possible. You get an honest date, including the drying time the work needs.

  • Price on paper up front
  • Covering and cleaning up included
  • A reply within 24 hours

Updated on · Edited by: Samir El Ouariachi, painter and plasterer

Plasterer smoothing a new section of ceiling after a leak, floor covered and a dehumidifier in the corner

What you can request urgently

No promises that can't be kept. If your job fits into a tradesperson's schedule, you hear straight away, with an honest date.

  • Repairing a ceiling or wall after water damage
  • Getting a home ready for handover or sale
  • A rental home between two tenants
  • A contractor whose tradesperson drops out

Starting fast isn't the same as finishing fast

A plasterer can sometimes start within a few days, but fresh plaster has to dry before paint or latex can go on. As a rule of thumb that is about one millimetre of thickness per day. If the home needs to be habitable in a week, the work and the drying time are planned around that, and you hear honestly what is and isn't achievable.

Tradesman checking a freshly plastered wall with a lamp in raking light

How long plaster needs to dry

Repairing a ceiling after a leak

First the leak has to be fixed and the surface dry, or the stain or peeling comes back. Take photos of the damage for your insurer before anything is removed. After that the ceiling can be repaired and finished smooth again.

Tradesman using a moisture meter to check whether a ceiling with a water stain is dry enough to repair

Ceiling repair after water damage: cost and insurance

Ready for handover, sale or a new tenant

With a sale or a change of tenant, every day counts. It is often the same jobs: filling holes and cracks, making a patchy ceiling smooth and giving the walls a fresh white coat by spraying or rolling. Spray painting in an empty home is quick and gives one even colour throughout the house.

Tell us the date it has to be ready. Then you hear what fits in that time, including drying time, and what can better wait. Better an honest schedule than a promise that turns out not to hold on the day.

Empty home with fresh white walls, a tradesman doing a final check with a lamp, keys on the windowsill

Spray painting in an empty homeFor landlords and property managers

Your plasterer didn't turn up?

Send the measurements, a few photos and the date it has to be ready by. If it fits a tradesperson's schedule, you hear an honest date within 24 hours. With water damage: have the leak fixed first and let the surface dry.

How an urgent job works

  1. 01

    Send photos and a date

    A few photos, an estimate of the m² and the date it has to be ready. That is enough to see what is possible.

  2. 02

    Honest schedule

    You hear which tradesperson is available and what fits in your time frame, including drying time. What isn't achievable, you hear too.

  3. 03

    Cause first

    With water damage, the leak has to be fixed and the surface dry. The moisture is measured before anything is repaired.

  4. 04

    Covering up and repairing

    Even in a hurry, everything gets covered. Then walls and ceilings are repaired and finished smooth.

  5. 05

    Finishing

    Once it is dry enough: priming and spraying or rolling, so the room looks even again.

  6. 06

    Handover

    Cleaning up, checking together and leaving the room clean. Ready for the viewing, the new tenant or the key handover.

Good to know

Drying can't be rushed
As a rule of thumb, plaster dries about 1 mm per day. With the heating on full or a dehumidifier aimed at the wall, you get cracks. So finishing fast means planning smartly, not forcing it.
Fix the leak, then the stain
A water stain comes back if the leak isn't fixed or the surface is still wet. That is why the moisture is measured before repairs.
Photos for your insurer
With water damage, take photos of the damage before anything is removed. Your insurer will often need them.
Spraying is fast in an empty home
In an empty home, taping off is done quickly and you spray all the rooms one after another. That makes spray painting the fastest way to hand over a home fresh.

What to expect from a good tradesperson

  • An honest date, even if the answer is that something doesn't fit
  • An explanation of drying time instead of a promise that can't be kept
  • With water damage, moisture measured first
  • Even in a hurry: floor and frames covered
  • The price on paper up front, urgent jobs included
  • Handed over clean, ready for a viewing or tenant

Frequently asked questions about an urgent plasterer

Does an urgent job cost more?

Sometimes. If something has to be moved in the schedule or work is done in the evening or at the weekend, you see that in the price beforehand. You never pay a surprise afterwards.

Can a room be plastered in one day?

The plastering itself often can, in an ordinary room without much repair. After that it still has to dry before you can paint or spray.

Can plaster be repaired straight after water damage?

No, first the leak has to be fixed and the surface dry. Otherwise the new plaster will peel or discolour. Someone can come and look straight away and fix the schedule, though.

Tell us in a minute what needs doing. You see an estimate straight away, and the quote comes on paper up front, with covering and cleaning up included.