Skip to content

Based near Amsterdam

Spetterloosplasterers & painters

Need a plasterer or painter for your project?

For contractors, property developers and property managers: plastering, spray painting and painting for new builds, renovations and empty rentals. Send the number of homes or the m², your start week and a drawing if you have one, and you hear within 24 hours whether and when there is capacity. You can write in English.

  • Price on paper up front
  • Covering and cleaning up included
  • A reply within 24 hours

Updated on · Edited by: Samir El Ouariachi, painter and plasterer

Two tradespeople at work in a new-build flat, walls plastered and partly sprayed, floor covered

What you can request

One request for the finishing work on walls and ceilings, from a single home to a whole complex.

Three plasterers working at the same time in a new-build home, materials neatly on a pallet
  • Plastering: thin skim on new-build walls or traditional plaster in renovations
  • Spray painting and latex on walls and ceilings
  • Rolled paint and painting, including stairwells and communal areas
  • Work on empty rentals: repairs, plastering and painting between tenants

How to get a price quickly

Send a drawing or specification (PDF), the m² per finish (paint-ready, wallpaper-ready, spray finish), the number of homes and your start week. The more complete the request, the sooner there is a price per m² or per home and the clearer it is how many people can work per week.

What to check with a subcontractor

As the main contractor, according to the Dutch Tax Administration (Belastingdienst), you can be liable for payroll taxes your subcontractor fails to pay (chain liability, ketenaansprakelijkheid). A G-account (G-rekening) of the subcontractor reduces that risk: you pay the payroll tax part into it. A self-employed person without staff pays no payroll taxes and cannot open a G-account.

Also ask for a Chamber of Commerce (KvK) extract, business liability insurance and, if the site requires it, VCA. Agree the price per m² or per home and the terms for extra work up front.

VAT reverse charge when subcontracting

When a plasterer or painter works as a subcontractor for you as the main contractor on a building, the reverse-charge scheme (verleggingsregeling) of the Belastingdienst usually applies: it covers work on immovable property. The subcontractor then puts no VAT on the invoice, but the words btw verlegd.

Belastingdienst: reverse charge when subcontracting (in Dutch)Belastingdienst: chain liability (in Dutch)

Which projects

New-build homes and apartments, renovation and conversion, rental homes between tenants, and non-residential buildings such as offices and shops. Send a drawing or specification and the work can be priced.

Stairwell in a new apartment building being sprayed white, railings and windows masked

Plastering and painting in one jobTradesperson dropped out? Urgent jobs

How projects works

  1. 01

    Drawing or specification

    Send the drawing or specification, the m² per finish, the number of homes and your start week.

  2. 02

    Price and capacity

    You get a price per m² or per home and hear what capacity is possible per week.

  3. 03

    Planning around your schedule

    Start and sequence are matched to the other trades, so nobody waits for anyone.

  4. 04

    Carrying out the work

    The work follows the agreed schedule, with floors and frames covered.

  5. 05

    Check

    Walls and ceilings are checked with raking light, materials and waste are taken away.

  6. 06

    Handover

    Handover per home or phase, without snagging on the plastering and painting.

Good to know

Chain liability
As main contractor you can be liable for your subcontractor's payroll taxes. A G-account (G-rekening) reduces that risk.
VAT reverse-charged
When subcontracting on work to a building, the reverse-charge scheme usually applies. The subcontractor's invoice then says btw verlegd.
Thin skim or traditional
On flat new-build walls a thin skim is often enough, and quicker. Renovations or uneven walls need traditional plaster. That affects price and planning.
Drying time in your schedule
Spray painting can only start once the plaster is dry. Putting that in the build schedule up front stops the spray painter coming for nothing or starting too early.

What to expect from a good subcontractor

  • A price per m² or per home based on a drawing or specification
  • Start and sequence matched to your build schedule
  • Extra work discussed beforehand, not afterwards
  • Work checked with raking light before handover
  • Materials and waste from the work cleared away
  • KvK registration, insurance, VCA where needed, and a G-account if the subcontractor has staff

Frequently asked questions from contractors

How quickly do I hear back?

Within 24 hours. You hear whether and when there is capacity for your schedule, and what else is needed for a price.

Is the price per m² or per home?

For projects a price per m² or per home is usual, based on a drawing or specification. Agree extra work up front, not afterwards.

Can a plasterer who dropped out be replaced at short notice?

Sometimes. Send the schedule and the m² still open, and you hear within 24 hours whether it can be done.

Is this an agency for self-employed plasterers?

No. You request work for a project, not hours or staff.

Which region?

Anywhere in the Netherlands. Spetterloos is based in Zwanenburg (Haarlemmermeer), near Amsterdam, and works with regular plasterers and painters in several regions. Mention the project location in your request and within 24 hours you hear whether there is capacity.

Tell us in a minute what needs doing. You see an estimate straight away, and the quote comes on paper up front, with covering and cleaning up included.