Skip to content

Based near Amsterdam

Spetterloosplasterers & painters

Finishing a new build: when do you start?

You can have the walls plastered or sprayed straight after handover, as soon as they are dry enough. That doesn't depend on a fixed number of weeks but on the moisture in the wall, and you measure that. The walls of a new build home are usually handed over wallpaper-ready (behangklaar) and need a thin coat of plaster first for a crisp latex finish.

Rather not work it out yourself? Ask for a free quote, in English, with covering and cleaning up included.

Get a free quote

Updated on · Edited by: Samir El Ouariachi, painter and plasterer

Wallpaper-ready at handover is not ready for paint

According to the Technisch Bureau Afbouw, what is called 'behangklaar' (wallpaper-ready) in new builds is often group 6: locally repaired concrete, with no requirements for flatness and with small air bubble holes. Thick wallpaper suits it, latex paint does not. If you want crisp white walls, a thin coat of plaster goes on first, and then latex.

When can you start?

A new home is full of construction moisture: in the concrete, in the floor and in fresh plaster. Latex on a wall that still holds moisture seals that moisture in and starts to peel or stain. That is why the moisture should always be measured before spraying. There is no fixed waiting time in months, because it differs per home, season and ventilation.

  • Switch on the ventilation from day one and keep the vents open
  • Heat the home normally, not extra hard to speed things up
  • Plan the work before you move in: an empty home is quicker to cover up
  • First plaster, then let it dry, then spray; the drying time is built into the schedule

Hairline cracks in the first year

In a new home, small shrinkage cracks can appear in the early period, often in corners and where wall meets ceiling. In practice that is normal and usually not a structural problem. Corners finished with corner beads and good preparation hold up better. If you already see cracks or damage at handover, have them added to the handover report (opleverrapport).

VAT on new builds

According to the Belastingdienst, the reduced 9% rate applies to plastering and painting homes that are more than 2 years old. A new build home is younger than that, so expect 21% VAT (btw) on a quote.

Sources

Also asked

Can I have wallpaper-ready walls spray painted straight away?

You can, but the little holes and irregularities will show afterwards. For a crisp result: first a thin coat of plaster, let it dry, prime, and then spray.

Does the home need to be empty?

Ideally, yes. An empty home is quicker to cover up, which saves time and money. That is why many buyers plan the work between getting the keys and moving in.

How long does plastering and spraying a whole home take?

That depends on the m², the number of ceilings and the drying time. With the quote you get a schedule in days, including the drying time between plastering and spraying.

Tell us in a minute what needs doing. You see an estimate straight away, and the quote comes on paper up front, with covering and cleaning up included.