Skip to content

Based near Amsterdam

Spetterloosplasterers & painters

What do you do before the plasterer comes?

Clear the room as much as possible, take down lights, curtains and pictures, and make sure there is power, water and somewhere to park. Covering the floor, window frames, windows and sockets is part of the plasterer's or sprayer's job, not yours. If your home was built before 1994 and an old ceiling needs sanding, first make sure about asbestos.

Rather not work it out yourself? Ask for a free quote, in English, with covering and cleaning up included.

Get a free quote

Updated on · Edited by: Samir El Ouariachi, painter and plasterer

What you sort out

The better the room is prepared, the sooner the work starts and the less covering up is needed. You will see that in the schedule.

  • Furniture out of the room, or together in the middle so it can go under plastic sheeting
  • Lights, curtain rails, pictures and shelves off the walls and ceiling
  • Fragile items and electronics out of the room
  • Power and water available, and a toilet that can be used
  • A parking space close to the door, or a permit if one is needed
  • Pets out of the room while the work is going on

What the tradesperson should do

Covering up is skilled work and should be included in the price. With a good tradesperson, floors are covered with protective floor runner, window frames and glass are masked off, radiators are wrapped and sockets and switches are shielded before any work starts. Afterwards, all the plastic and tape comes off and everything is cleaned up. Ask with every quote whether covering up and cleaning up are included.

Two things to check beforehand

Year of construction: if your home is more than 2 years old, the Belastingdienst applies 9% VAT (btw) to plastering and painting. You can find the year of construction in the BAG via bagviewer.kadaster.nl.

Asbestos: according to Milieu Centraal, no asbestos was used in homes built after 1994. If your home is older and an old ceiling or an old layer needs to be sanded or scraped, have an asbestos survey done first.

During and after the work

While it dries, keep a window slightly open and heat the home normally. Don't touch fresh plaster, and only hang things up once it is dry and finished. At handover you walk through the room together with the tradesperson, and the job is only done when you are happy.

Sources

Also asked

Do I need to unscrew the sockets myself?

No. Sockets and switches are shielded. If you want them temporarily removed, discuss that beforehand, because that involves electrical work.

Can I stay at home during the work?

Yes, but not in the room being worked on. Agree beforehand which rooms need to be free and when.

Tell us in a minute what needs doing. You see an estimate straight away, and the quote comes on paper up front, with covering and cleaning up included.